Establishing 100% Procurement Visibility on a $850K HVAC Fitout
About HPV Elevate
HPV Elevate is a pan-India HVAC and MEP services provider specialising in engineered cooling and building services for complex commercial and facility environments. Founded in 2007, the company has executed over $230Mn worth of projects and operates with a team of 250+ professionals across multiple states.
HPV Elevate delivers turnkey HVAC solutions spanning concept and load studies, BOQ-led execution, retrofits, and uptime operations, integrating design, installation, and AI-enabled optimisation to reduce energy use and ensure reliable performance. Its services extend to electrical, fire protection, and civil interiors, making it a trusted partner for developers, data centres, and technical facilities where precision, uptime, and efficiency are paramount.
Project Name:
HDFC Bank, Candor Tech Space
Location:
Candor Tech Space, Kolkata
Project Category:
MEP
Executing a large-scale HVAC fit-out for a premier banking institution requires precision. Located in the bustling Candor Tech Space in Kolkata, this project involved a massive financial scope with a BOQ value of $850K. The project focused on high-end HVAC implementation, requiring tight coordination between site engineering, inventory management, and a fragmented vendor network to ensure the facility was handed over operational and on budget.
Complexity of the Project
This project presented three specific layers of difficulty that traditional Excel-based management could not handle:
High-Volume Vendor Fragmentation: The project did not rely on a single turnkey contractor but engaged 35+ different vendors. Managing communication, orders, and ledgers across this many stakeholders creates a high risk of information asymmetry and duplicate payments.
The “BOQ vs. PO” Reconciliation Trap: With a master BOQ containing 170+ distinct line items and a procurement value of $600K+, manually tracking which line item was ordered against which of the 125+ Purchase Orders is nearly impossible. This is where most construction projects suffer “margin bleed” due to over-ordering.
Material Inventory Volatility: The site managed a significant material flow with ~$40K worth of stock received. Without real-time consumption tracking, high-value HVAC components face risks of theft, damage, or misplacement, directly impacting the bottom line.
Â
How RDash Helped
RDash was deployed to move the project from “reactive” tracking to “proactive” financial governance. By digitising the workflow, we enforced the “Maker-Checker” rule, ensuring that every rupee spent had a digital footprint and an approval trail.
Plugged Margin Leakage in Procurement
Majority of margin leakage in construction projects traces back to not having a digital record of order elements issued to vendors. For HDFC, we moved the entire ordering process off Excel and email.
Impact: We successfully reconciled 125+ Orders against the master BOQ.
Result: Achieved 100% visibility on the ~$600K+ procurement spend, ensuring no vendor was paid for non-tendered items without a flagged approval.
Enforced Cashflow Discipline (The 3-Way Match)
We established a strict digital thread from PO creation to Invoice Acceptance.
Impact: Managed $550K in Invoices with a seamless approval flow.
Expense Control: The system processed ~$42K in site expense requests, but due to RDash’s rigorous approval hierarchy, only ~$20K was approved initially. This highlights the effectiveness of the “Maker-Checker” system in preventing unnecessary petty cash bleed.
Site Reality vs. Reported Progress
We moved beyond ad-hoc WhatsApp updates to structured Daily Progress Reports (DPRs).
Impact: Over 30+ DPRs were generated, providing a “360-degree project reporting process”.
Result: By capturing material consumption and “Current Stock” (~$40K) daily, the project leadership maintained a live view of inventory levels, reducing wastage and theft risks typically associated with MEP projects.